Business Licences & Electrical Permits for Filming in Maple Ridge

CivicSend Slideshow Left Arrow Slideshow Right Arrow
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5

WHAT YOU NEED TO GET STARTED


BUSINESS LICENCES


Business Licences for the City of Maple Ridge are valid until 31 December of the year in which they have been issued.

If you are a production company from out of town but will be filming temporarily in Maple Ridge, you will not need
a general business licence, but you will need a Non-Resident Business Licence.

NON-RESIDENT BUSINESS LICENCE


The Non-Resident Business Licence will permit you to take out electrical permits for filming.

Submit a completed Non-Resident Business Licence form for each production with a fee of $110.00 per production
to the Film Liaison or the Licences, Permits & Bylaws Department address listed on the form.

If at a later date, you wish to extend the filming dates beyond the end date indicated on your licence, you must
apply for another Non-Resident Business Licence.

Download the Business Licence ApplicationNote: Check the Non-Resident checkbox

ELECTRICAL PERMITS AND AUTHORIZATION FORMS


ELECTRICAL PERMIT APPLICATION FOR FILMING (ADDENDUM B)


An Electrical permit is required prior to energize any electrical equipment for filming purposes in the City of
Maple Ridge as per the Canadian Electrical Code Section 2-016.

Electrical permit fees vary with the number of locations. See the fee schedule.

If you have multiple locations, you may list them on one Electrical Permit Application.
Download the Electrical Permit Application.

You should use the crew call time of your start date as the time for the electrical inspection. If the proposed
filming is cancelled or you need to reschedule your inspection time (up to and including the day of inspection) 
call 604-467-7311 (select one of the inspector lines then press “0” for immediate assistance) so the inspector
can be contacted. If filming is cancelled without 24-hour’s notice, you will forfeit the inspection fee charge.

ELECTRICAL CONTRACTOR AUTHORIZATION FORM FOR FILMING (ADDENDUM C)


An Electrical Contractor Authorization form is to be fully completed by your generator operator and submitted
along with your Electrical Permit Application. The City of Maple Ridge may require a copy of the generator
operator’s Electrical Contractor Registration card showing class designation.

An individual Electrical Contractor Authorization form is required for each location. The registered electrical
contractor listed on the form MUST BE onsite during the inspection and for the duration of the film shoot.
Download the Electrical Contractor Authorization Form.