225 Street Pump Station Upgrades and Forcemain

The 225 Street Sewage Pump Station is located at the intersection of 225 Street and the Haney Bypass and it conveys sewage via the existing South Slope Forcemain west along River Road to Steeves Street where it discharges into a Greater Vancouver Sewerage and Drainage District trunk sewer. To meet the long-term needs of the City, both the pump station and forcemain need to be upgraded to reliably convey increasing sewer flows.

The City has retained Associated Engineering (B.C.) Ltd. to prepare the preliminary and detailed designs, prepare tender documents and provide construction services for the project.

The existing forcemain conveys sewage from the pump station along River Road from 225 Street to Steeves Street. The existing forcemain is located within the Fraser River Escarpment and the intent is to re-route the new south slope forcemain north of the existing escarpment setback areas and Haney slide. View proposed forcemain alignment (PDF)

The first phase (from the pump station to the intersection of Carshill and Lougheed Highway) will be constructed as part of the Ministry of Transportation and Infrastructure (MoTI) reconstruction of the Haney Bypass project. View MoTI/City proposed works (PDF).

The remaining phases are planned for 2019/2020.