The City of Maple Ridge (CMR) invites tenders to provide all labour, materials, and equipment to construct the civil work only as per specification for the synthetic turf replacement at Samuel Robertson Technical Secondary. The scope of work does not include the supply and installation of synthetic turf and shock pad, which has been procured separately.
The Work generally includes, but is not limited to, all site preparation including removal and disposal of existing synthetic turf and related infill, excavation and filling permeable aggregate base, and assessment of the existing site drainage system.
A NON-MANDATORY site meeting is scheduled for 8:30am (local time) on March 20, 2018 at Samuel Robertson Synthetic Field Turf Replacement (10445 245 Street, Maple Ridge, BC). Attendance is NON-MANDATORY to submitting a Tender response for consideration.